Road Services Division Capital Improvement Program

Search results for:

All projects
« Return to project search

Name Project No. Phase Location
2017-2018 Guardrail Preservation #1131274 Construction Started Various
236th Avenue SE and SE 384th Street Road Preservation #1136935 Construction Started 236th Avenue SE / SE 384th Street
Beacon Coal Mine Road S Road Preservation #1136934 In-House Construction Beacon Coal Mine Road S
Coal Creek Bridge #3035A Replacement #1135997 Intermediate Design Lake Walker Road at Coal Creek
Landsburg Bridge #3075 Repair #1134049 Construction Completed Landsburg Road SE at Cedar River, 1.5 miles north of SE Kent
NE Stillwater Hill Road #1129714 Intermediate Design NE Stillwater Hill Road
Old Cascade Highway/Miller River Bridge #999W East Improvements #1129596 Final Design Old Cascade Hwy - Skykomish to Miller River east bank
Old Cascade Highway/Miller River Bridge #999W West Improvements #1129595 Final Design Old Cascade Hwy - Miller River Road to Miller River west ban
Preston Maintenance Facility #1127271 Preliminary Design 29111 SE Preston Way
Redmond Ridge Drive NE Roundabout #1134081 Intermediate Design Intersection of Redmond Ridge Drive NE at NE Alder Crest Dri
Renton Ave Sidewalks Phase III #1129599 Final Design Renton Avenue S from 68th Avenue S to S 112th Street
SE 176th Street at SE 171st Way Roundabout #1130261 Bid/Contract Award Intersection of SE 176th Street and SE 171st Way
SW 102nd Street at 8th Avenue SW Roundabout #1131237 Bid/Contract Award At the intersection of SW 102nd Street & 8th Avenue SW
Westside Highway SW Permanent Roadway Repair #1130410 Construction Started (Approximately 250' south of 16440 Westside Highway SW)
Woodinville Duvall Bridge #1136E Repair #1134048 Construction Started NE Woodinville Duvall Road at the Duvall Slough, east of Wes